ERA Passed Factory Acceptance Tests for a MLAT System in Mongolia

4 March 2017

ERA announced that it had successfully passed Factory Acceptance Tests for the MLAT surface system which is to be used at NUBIA international airport in Ulaanbaatar.

ERA in cooperation with ACH Holding LLC is getting ready to install a multilateration system for a brand new international airport in the Mongolian capital. The high quality and reliability of ERA’s NEO multi-sensor surveillance system has been verified and confirmed during the Factory Acceptance Tests in the end of January.

The system is intended for surface surveillance of the aircraft as well as vehicles, equipped by the ERA vehicle tracking unit SQUID, to provide safety and operational enhancement of ground surveillance for the end user – the Mongolian Civil Aviation Authority (MCAA). The tried-and-tested product represents a modern, flexible and certified ATM surveillance system that can be easily further extended, once the second runway at Ulaanbaatar International Airport is finalized.

Asia Pacific

Tags

  • ATM News
  • Contracts

Subscribe to the CANSO publications